GLAST/LAT > DAQ and FSW > FSW

FSW Requirement 5.3.17.1 (prev, next)


Req. 5.3.17.1: "Configuration of Subsystems"

Upon command, the SIU FSW shall configure the LAT power distribution subsystem and the CAL, TKR, ACD, and T&DF subsystems by writing to the T&DF-provided configuration registers. Refer to [13] - [23] for details.

Basis (help)

[4] (5.3.4)

Context (help)

Test(s)