GLAST/LAT > DAQ and FSW > FSW

FSW Requirement 5.3.16.2.2 (prev, next)


Req. 5.3.16.2.2: "Load Shedding Notification to Ground"

Assuming that power is maintained during the 15 seconds, the SIU FSW shall put a notification of powering off due to load shedding into the telemetry stream to the ground, prior to powering off.

Basis (help)

[Derived]

Context (help)

Test(s)

    013a: Operational Modes - Safe Modes

    This test shall verify that the SIU FSW can perform the correct transition of the LAT into Safe Mode upon command, can properly execute the Safe Mode algorithms, and can perform the subsequent recovery via Engineering Mode. It shall also verify the correct response to SAA entry commands and subsequent recovery.