GLAST/LAT > DAQ and FSW > FSW
FSW Requirement 5.3.17.2 (prev, next)
Req. 5.3.17.2: "Configuration by File"Upon command, the SIU FSW shall configure the LAT power distribution subsystem and the CAL, TKR, ACD, and T&DF subsystems by writing to the T&DF-provided configuration registers specified in a configuration file that identifies the registers to be written and the corresponding value of the registers. Refer to [13] - [23] for details. Basis (help) [4] (5.3.4)
5.3.4: "Configuration of Sub-Systems" The control system shall provide signals to configure the CAL, TKR, ACD, TRG, dataflow, and power supply system. 14: "GTRC Spec." (LAT-SS-00170) 15: "GCFE Design Description" (LAT-SS-00424) 16: "GCRC Design Description" (LAT-SS-00208) 17: "ACD-LAT ICD" (LAT-SS-00363) 18: "TEM Programming ICD Spec." (LAT-TD-00605) 19: "AEM Programming ICD Spec." (LAT-TD-00639) 20: "CRU Programming ICD Spec." (LAT-TD-01547) 21: "EBM Programming ICD Spec." (LAT-TD-01546) 22: "GEM Programming ICD Spec." (LAT-TD-01545) 23: "PDU Programming ICD Spec." (LAT-TD-01543)
Context (help)
Function(s)Test(s)007: T&DF, TKR, CAL, and ACD Internal Configuration Test This test shall verify the ability of the SIU to configure the T&DF,TKR, CAL, and ACD subsystems as desired and read back the necessary configuration information to completely determine each subsystem's configuration. |