GLAST/LAT > DAQ and FSW > FSW
FSW Requirement 5.3.12.3 (prev, next)
Req. 5.3.12.3: "TKR Trigger Check"Upon receipt of the appropriate command, the FSW shall perform a trigger check as defined below: * Loop through one channel per GTRC. * Inject large pulse (DAC~63) 10 times at low threshold (DAC~10); issue at least one trigger. * Failed channel information should be forwarded to the spacecraft for delivery to the ground. Basis (help)
3.1.3.2.2: "Calibration" The GLAST system shall perform calibration observations as required during the course of the mission. 5.4.14: "Calibration" The dataflow system shall provide commands to calibrate and readout the sub-systems. Context (help)
Test(s)014: LAT Diagnostic and Calibration Modes This test shall verify that the SIU FSW properly transitions to Diagnostic and Calibration Modes upon command, then properly executes the requested diagnostic and calibration algorithms. |