GLAST/LAT > DAQ and FSW > FSW > FSW Task Index > Instrument Physics

IP Configuration Phase (Animation)


Description

The Instrument Physics (IP) Configuration phase must be performed before any of the other modes can begin.

  • The Spacecraft sends a Command packet to the Master.

  • The Master forwards this, as a message, to the Slaves.

  • It then forwards the command, as a message, to the LAT Instrument. The LAT returns configuration data, which the IP Master task saves.

    Note: This animation requires QuickTime.