GLAST/LAT > DAQ and FSW > FSW

FSW Requirement 5.3.1.1 (prev, next)


Req. 5.3.1.1: "Power-up"

The FSW shall perform a primary boot in response to SIU or EPU power-up.

Basis (help)

[Derived]

Context (help)

Function(s)

Test(s)

    009a: FSW and LAT initialization

    This test shall verify that the SIU and EPU(s) can correctly boot themselves, report system errors during primary boot in housekeeping telemetry, establish a reference state based upon information in non-volatile storage, signal boot status over a discrete line to the SC (SIU only), and then power and initialize the remaining LAT subsystems in an orderly manner, resulting in a known reference state at the end of the process. This state shall be verified through internal configuration read back and LAT telemetry. The test shall also verify that the SIU and EPU(s) can write a boot error log and return the contents of the log in telemetry, on command.