Tower11-X0 summary
Back to Top Page
Back to Tower11
Layer-OR Occupancy Time-Variation
TOT Charge-deposit distribution
INFO
TOT_LWidth: 0.50
TOT_Peak: 5.1
TOT_GSigma: 0.5
TOT_FitProb: 9.2e-01
Strip Occupancy
WARN
strip338:strip:338 occupancy, 2.1e-02 > 2.0e-02
Hot strip338: Need to be data-Masked
Hot strip338: Need to be trig-Masked
trig-mask required: strip [338]
data-mask required: strip [338]
Layer averaged Strip Occupancy, Time-Variation
GTFE averaged Strip Efficiency