GLAST/LAT > DAQ and FSW > FSW
ISIS Requirement 1.7 (prev)
Req. 1.7: "Power"The ISIS shall provide loads that replicate the instrument power demands and a means for controlling the amount of load on the power bus. Context (help)
Test(s)10: Power Control (Towers, ACD, EPUs) This test shall demonstrate that the ISIS provides power loads as specified in the LAT-SC ICD, and is able to control the amount of load on the power bus. |