GLAST/LAT > DAQ and FSW > FSW

ISIS Requirement 1.7 (prev)


Req. 1.7: "Power"

The ISIS shall provide loads that replicate the instrument power demands and a means for controlling the amount of load on the power bus.

Context (help)

Test(s)

    10: Power Control (Towers, ACD, EPUs)

    This test shall demonstrate that the ISIS provides power loads as specified in the LAT-SC ICD, and is able to control the amount of load on the power bus.